I did get the drain pipe for the sink rerouted including the vent line. Also installed new laminate flooring. I didn’t snap any pictures. I also got the trim around the bathroom door back up. We are currently waiting on parts including the sink, a new shower valve and a curved shower curtain rod. (We will give that a test).